Installation, commissioning of parallel grippers, Jaw parallel grippers, Rpp-a – ROHM RPP / RPP-A 2-jaw parallel gripper User Manual

Page 26: Caution, Installation of gripper rpp-a

Advertising
background image


Installation, Commissioning of Parallel Grippers

2-jaw parallel grippers

ID 1104573 Operating Manual RPP; RPP-A
Röhm GmbH, Dillingen Works Röhmstr. 6, 89407 Dillingen/Donau, GERMANY, Tel. (49)9071/508-0

Page 26 of 37

RPP-A

Caution:

The energy supply must be switched off during installation of the gripper. Observe also the

safety precautions. Please refer to the catalogue for the connection dimensions of the respective gripper
size.

Installation of Gripper RPP-A

1. Position the gripper using the two positioning pins contained in the accessories kit.

2. Bolt on the gripper from above using 4 mounting bolts supplied. If the gripper is mounted on

the side, the customer must provide mounting bolts.

Please observe the specified tightening torques.

3. With hoseless direct connection, pay attention to a clean connection surface. Use the

corresponding gaskets from the accessories kit.

4. During installation with compressed air screw fitting, pay attention to leak tightness of the

fitting.

Caution! When using hoseless direct connections, remove the grub screws and close off the
ports not used using suitable blind plugs.

5. Installation and adjustment of the polling sensors.

See "Mounting of the proximity switches"

Function check

1. Actuate the gripper and test the stroke end positions of the jaws.

2. Check the sensor signal.

3. Check this function also with the workpiece.

Anschraubflächen

Anschraubflächen

Für schlauchlosen

Direktanschluss von unten

M5; G1/8"; G1/4 - Gewinde für

Pneumatikanschluss

Zyl.-Stift, Gewindebohrung bzw.

Durchgangsbohrung für Anbau des

Greifers von unten.

Zentrierhülse;

Gewindebohrung bzw.

Durchgangsbohrung für

seitlichen Anbau des

Greifers.

Sperrluftanschluss

Positionierung des Greifers

über Zyl.-Stift

Advertising