InfraStruXure Power Generation System

11

Smart Distribution Panel with ATS

Front view, door closed

Knockouts are provided on the roof, the

sides, and the floor of the ATS for

running utility and generator input wires

and for distributing power to equipment

in your data center. Connecting conduit

to the ATS does not require drilling. Use

a knockout punch to enlarge a knockout,

if necessary.

 The user connection plate is attached to

the ATS monitoring unit. The plate can

be removed, simplifying access to input

contact, relay output, network, and EPO

connections. These connections can

likewise be routed through a knockout in

the plate (see

“User connection plate” on

page 16 for more information) to avoid

wiring complications.

 The bottom access panel can be

removed for better access to the panel

board. Use a #2 Phillips screwdriver to

remove the two M6 flat-head screws

securing the panel to the enclosure.

 The perforated steel front door protects

against ready access to the switches, the

circuit breakers, and the display interface

(see page 29). To access the display

interface without opening the front door,

simply remove the display’s Plexiglas

covering (see page 67 for instructions).