Final installation checklist – Samsung DV422EWHDWR-AA User Manual

Page 19

Advertising
background image

installing your dryer

_19

FINAL INSTALLATION ChECkLIST

The dryer is plugged into an electrical outlet and grounded properly.

The exhaust ductwork is hooked up and the joints are taped.

You have used rigid or stiff-walled flexible metal duct material, not plastic flexible duct.

The dryer is level and is sitting firmly on the floor.

For gas models: The gas is turned on and there are no gas leaks.

Start your dryer to confirm that it runs, heats, and shuts off.

01 installing your dr

yer

HUDSON DRY_DV456_USER MANUAL_DC68-03170A-08_EN.indd 19

2014/3/19 14:20:39

Advertising