Unpacking the switch – Allied Telesis AT-8088/xx (MT and SC) User Manual

Page 51

Advertising
background image

AT-8000 Series Fast Ethernet Switches Installation Guide

51

Unpacking the Switch

To unpack the switch, perform the following procedure:

1.

Remove all components from the shipping package.

Note
Store the packaging material in a safe location. You must use the
original shipping material if you need to return the unit to Allied
Telesyn.

2.

Place the switch on a level, secure surface.

3.

Make sure the following hardware components are included in
your switch package. If any item is missing or damaged, contact
your Allied Telesyn sales representative for assistance.

One AT-8000 Series Fast Ethernet Switch

Two mounting brackets

Eight flathead Phillips screws

AC power cord (AC switches only; Americas, EC, Australia, and
UK only)

Documentation CD

Warranty card

Advertising
This manual is related to the following products: