Installation initial start-up – Blodgett BLP-E Series User Manual

Page 10

Advertising
background image

8

OM-BLT/BLP-E

Installation

Initial Start-Up

Now that your braising pan has been installed, you should test it to ensure that the

unit is operating correctly.

1. Remove all literature and packing materials from the interior and exterior of the

unit.

2. Turn on the electrical power to the unit.

3. Put enough water into the pan to cover its bottom to a depth of 1/4” to 1/2” (6 to

13 mm). With the pan body in the horizontal position, note how the water covers

the pan bottom. This is a good method to use for confirming that the unit is

properly leveled.

4. Set the thermostat to 235˚F. The heating indicator light should come on to show

that the pan is heating. Heating should continue until the water boils.

5. To shut the unit down, turn the thermostat dial to “OFF.”

6. Turn the tilting handwheel clockwise to pour out the water and to confirm that

the pan body can be tilted smoothly from horizontal to vertical. For power tilt

models, push the UP/DOWN switch to confirm operation of tilting system.

If the unit functions as described above, it is ready for use. If it does not, contact your

local Authorized Service Agency.

WARNING

WATER IS EXTREMELY HOT AND CAN CAUSE

SEVERE BURNS. AVOID CONTACT WITH HOT

WATER WHEN EMPTYING UNIT.

6. For conversion from 3-phase to 1-phase

a. Verify that the branch circuit wiring is adequate for any increased

amperage requirements. (See table on previous page)

b. 1-phase requires two jumper wires. One jumper wire exists on the terminal

block for 3- phase input. The second jumper wire is located in a plastic bag

inside the control box.

c. Attach jumper wires to terminal block as per wiring diagram for 1 phase

supply.

d. Complete “conversion label” (supplied in bag) and adhere it to the control

box near the UL data plate.