Installation – Blodgett KLT-E Series User Manual

Page 8

Advertising
background image

6

OM-KLT-E

The kettle is provided with complete internal wiring and is ready for immediate
connection. Wiring diagrams are provided in this manual and on the inside of the
control housing service panel. Any mechanical or electrical changes must be approved
by the Food Service Engineering Department. The completed unit has been operated
at the factory to test all controls and heater elements.

1.

Set the kettle in place and level it by turning the bullet feet to adjust leg length.
Allow clearance around the unit for cleaning, maintenance and service.

2.

Confirm that the jacket water level is above the mid point of sight glass. If the
level is low, follow the instructions under “Jacket Filling and Water Treatment,”
Page 14.

3.

The open end of the elbow on the outlet of the safety valve must face
downward. If it does not, turn it to the correct position.

4.

Provide electrical power specified on the equipment electrical information plate.
Observe local codes and/or The National Electrical Code in accordance with
ANSI/NFPA 70 - (current edition).

5.

The equipment is shipped ready for three phase operation. Refer to the wiring
diagram for single phase operation.

6.

Bringing the electrical service through the entrance at the rear of the support
housing with one inch conduit, making a watertight connection with the
incoming lines. Observe local codes and/or the National Electrical Code in
compliance with ANSI/NFPA 70 (latest edition). When there is a choice between
applicable codes, we recommend following the more stringent code. (A BX
connection is not recommended.)

7.

Electrically ground the unit at the terminal provided.

8.

Check the following to confirm that your kettle is properly installed:

Room for cleaning and servicing

The kettle is level

The correct amount of water is in the kettle jacket

Safety valve is pointed down

Unit is connected with a waterproof supply of the proper voltage, phase
and amperage rating

ELECTRICAL SPECIFICATIONS*

20E-KLT

40E-KLT

60E-KLT

kW

Amperes

kW

Amperes

kW

Amperes

208 Volts

11

30

21

59

21

59

240 Volts

14.4

35

24

61

24

61

480 Volts

12

15

24

29

24

29

400 Volts

12

17

24

35

24

35

* All stated for three-phase. Single -phase available

Installation

WARNING

INSTALLATION OF THE KETTLE MUST BE

DONE BY A CERTIFIED ELECTRICIAN OR

AUTHORIZED REPRESENTATIVE QUALIFIED

TO WORK WITH ELECTRICITY. IMPROPER

INSTALLATION CAN RESULT IN INJURY

TO PERSONNEL AN/OR DAMAGE TO

EQUIPMENT.

CAUTION

ELECTRICALLY GROUND THE UNIT AT

THE TERMINAL PROVIDED. FAILURE TO

GROUND THE UNIT COULD RESULT IN

ELECTROCUTION AND DEATH.

Advertising