Swiftech APEX ULTRA PLUS User Manual

Page 34

Advertising
background image

Copyright Swiftech 2006 – All rights reserved – Last revision date: 08-30-06 - Information subject to change without notice – URL:

http://www.swiftnets.com

Rouchon Industries, Inc., dba Swiftech – 3700 Industry Avenue, Suite 104, Lakewood, CA 90712 – Toll free (US): 866-857-9438 – Fax 562-595-8769 - E Mail:

[email protected]

PAGE 34 of 36

You can also visit this link for further information: http://www.directron.com/2powersupplies.html

‰ Filling-up the circuit

Simply pour the coolant that you prepared into the reservoir – carefully to avoid spills, allowing the circuit to fill-up

by simple gravity. Note: for the gravity to take effect the reservoir should be placed or held at the highest point of the
cooling circuit. Once the reservoir is full, seal the fill port back with its cap in order to avoid any spills, and start-up the
pump. The reservoir will quickly (within 1 second) empty itself. Immediately turn off the pump, top-off the fluid to the
maximum level, and restart the pump. You need to repeat this operation 2 to 3 times, until the circuit is finally full of
coolant. Then, allow the system to run from 10 to 30 minutes uninterrupted to clear all the micro-bubbles and foam, and
finally top-off the level one last time. Your liquid cooling circuit is now ready, and you may permanently install the
reservoir.

Allow the system to run for (3) hours and frequently inspect all your connections for possible leaks before

you reconnect and re-install all your components (motherboard, hard drives, etc.)

CONGRATULATIONS, YOUR INSTALLATION IS NOW COMPLETE!

Example of installation

Advertising