Alloy Computer Products NS-16T01FS User Manual

Page 14

Advertising
background image

8

Installation

The site where you install the hub stack may greatly affect its
performance. When installing, consider the following pointers:

¾

Install the Switch in a fairly cool and dry place. See

Technical Specifications for the acceptable temperature
and humidity operating ranges.

¾

Install the Switch in a site free from strong

electromagnetic field generators (such as motors),
vibration, dust, and direct exposure to sunlight.

¾

Leave at least 10cm of space at the front and rear of the

Switch for ventilation.

¾

Install the Switch on a sturdy, level surface that can

support its weight, or in an EIA standard-size
equipment rack. For information on rack installation,
see the next section,
Rack .

¾

When installing Switches on a level surface, attach the

rubber feet to the bottom of each device. The rubber
feet cushion the Switch and protect the case from
scratching.

Advertising