Installation – Pitco Frialator CRTE Counter Top Rethermalizer User Manual

Page 8

Advertising
background image

CRTE COUNTER TOP RETHERMAILZER

INSTALLATION

L20-259, rev. 7 (09/13)

6

1.6. VENTILATION AND FIRE SAFETY SYSTEMS
Your new appliance must have proper ventilation to function safely and properly. It is very important
to install a fire safety system. Your ventilation system should be designed to allow for easy cleaning.
Frequent cleaning and proper maintenance of the ventilation system and the appliance will reduce the
chances of fire. Ventilation and fire safety systems must comply to local and national codes. Refer to
ANSI 83.11 for a list of reference documents that will provide guidance on ventilation and fire safety
systems.


1.7. INSPECTION
Before you begin filling and operating the appliance, perform the following visual checks:

 After the appliance is in its permanent location, check to ensure that it is level. Any additional

leveling that is necessary can be performed as previously described.

 Ensure that the probe, heating element, low water level sensor and high temperature limit is in

place and secure. Check the high limit bulb mounting screws to ensure that they are tight.

 Review the installation portion of this manual and ensure that all steps have been followed and

executed properly.






































1) Probe
2) High Temperature Limit
3) Heating Element
4) Low Water Level Sensor

CAUTION

Be careful not to disturb or damage the probe, low water
sensor and high temperature limit during operation and
cleaning of this appliance.

Advertising