Pump Flow Calibration

Page 18

Flow Calibration

Chemical metering systems are designed to provide chemicals to a process at precise flow rates.
Metering pump output (flow rate) can be set as a function of both stroke length and stroke frequency.
A Calibration Column is used to determine pump flow rate and to enable flow rate adjustments. The
column must be filled with the dosing chemical prior to performing the calibration.





A description of the Calibration Column and the calibration procedure is shown on Page 20. Review
this before proceeding with the next steps.

Filling Calibration Column

For a skid system with a cross-connect, the
Calibration Column is filled by the pump.
See Figure 15, at left.

1. Turn the Column Isolation Valve to allow

flow from the cross-connect into the
Calibration Column.

2. Then turn the Flow Diverter Valve to direct

flow from the Discharge Header through the
cross-connect and into the Calibration
Column.

3. Once the liquid level in the Calibration

Column reaches slightly above the topmost
scale mark, turn the Flow Diverter Valve to
re-direct flow into the system. Do not
overfill.

4. Close Column Isolation Valve.
5. Calibration Column is filled and ready for the

calibration procedure.


Note: While the Calibration Column is being filled in
this manner, dosing chemical will not be provided to
the served process.

!

CAUTION

Use extreme care when handling chemicals.
Avoid any spray, splatter or spilling.
Always wear appropriate protective clothing.

Flow Diverter
Valve (3-way)

Column Isolation
Valve (3-way)

Skid Suction
Valve

Pump Suction
Connection

Cross-connect

Calibration
Column

Figure 15

Skid System with Cross-connect