8 battery, Battery, Selftest and software update after hardware change – Beijer Electronics iX TxA EN User Manual

Page 17

Advertising
background image

TxA Maintenance

3.2.8

Battery

The panels listed below use a rechargeable battery. All other panels use a BR 2032
battery.

Panels with part numbers 630000101, 630000201

and 630000301:

When connecting the operator panel to the power outlet for the first time, make
sure not to interrupt power for a minimum of 48 hours in order to charge the
battery completely. After that, the battery may be charged partly during a shorter
period of time.

3.2.9

Selftest and Software Update af-

ter hardware change

It is important and recommended that the panel is tested after a change of
hardware has been made.
To do so, a software update has to be made and after that the selftest program with
the connected test-plugs has to be performed.

Note:
Please refer to chapter

Software

and the iX Developer online help.

Beijer Electronics, MAEN021

17

Advertising