Changing the heel dies – Hawk Industries Hawkjaw Jr. Manual 65K-ALS Serial Numbers 4 to 9 User Manual

Page 40

Advertising
background image

Changing the Heel Dies

Tools Required

3/4" wrench, See Drawings p. 128.

1. Make sure the HawkJaw is off the

drill pipe connection and in the rest
position
on the derrick.

2. Shut down the Hydraulic power

unit.

3. Press, push, and pull all control

buttons repeatedly to bleed
hydraulic pressure.

4. Disconnect the Air power supply.
5. Press, push, and pull all control

buttons repeatedly to bleed air
pressure.

6. Assume that there is still a load on

every actuator. Proceed with
caution.

Initial Steps

Continued on next page.

Top Wrench Heel Die

1. Use the 3/4" wrench to remove the

Heel Die Roller Bolts (B).

2. Remove the Roller Bushings

(RB).

3. Remove the Heel Die Rollers

(R).

4. Pull out the Heel Die Pin (P).
5. Pull out the Die Holder (DH).
6. Slide out the worn Die (D).

D

DH

P

R

B

RB

40 Maintenance & Repair

JC

Advertising