Warning – American Dryer Corp. AD-115ES II User Manual

Page 17

Advertising
background image

13

4. Exhaust Transition Piece

a. Inside the basket (tumbler) of this dryer is an

exhaust transition piece that must be installed on
the outlet of the exhaust before any further venting
is connected:

1) Remove the exhaust transition piece from the

basket (tumbler) and place it on the exhaust
outlet.

2) Using the screws provided, secure the exhaust

transition piece to the dryer.

NOTE: It is recommended that this joint be taped

as well as ALL other duct joints to prevent
moisture and lint from escaping into the
building.

WARNING

An exhaust duct transition piece is shipped inside of the dryer’s
tumbler and MUST be installed on the dryer ’s
exhaust duct, with the hardware provided, BEFORE
location venting is connected to the dryer.

THIS EXHAUST DUCT TRANSITION PIECE

MUST BE INSTALLED FIRST!

Failure to observe this installation requirement may result in
damage to the dryer, create a FIRE HAZARD and will VOID
the manufacturer’s warranty.

012999JEV-GS/cj

P/N: 114092

Advertising