Preparing the door/locks – Australian Monitor Integrator Rack User Manual

Page 7

Advertising
background image

6

Mounting the front/rear locks

The locks and key sets will now need to be mounted to the front and rear door.

NOTE: It is easiest to lay the door on a flat surface with pressure on the lock
when doing this and step 6 and 7.

The lock has two screws in the centre of the lock that hold on a bracket.
These screws will need to be removed so the bracket can go on the backside of
the door and the lock can go on the front side. It is best to keep the lock locked
for this part of the process.

Ensure the lock is installed the correct way up. The spring loaded catch on the
front and rear door indicates the top of the door.

7

Mounting the front/rear lock catches

The locking catch will now need to be mounted to the door. Once again it is
best to keep the lock locked in order to fit the catch.

To fit the catch simply remove the screw from the top of the lock along with the
single round washer, leave the two spacers on the square shaft. Place the
lock catch on top of the two spacers with the tongue facing the closest edge
of the door.

8

Mounting the side panel locks

The small barrel locks mount to the side panels. Simply remove the nut from
the lock and install it in the side panel. Make sure the flat edges of the barrel
lock are facing up and down once the lock is installed.

9

Mounting the side panel lock catch

To mount the catch simply remove the screw from the rear of the barrel lock
and place the lock catch on the square shaft. The lock catch mounts with the
tongue facing the top of the panel.

PAGE 7

INTEGRATOR RACKS INSTALLATION AND OPERATION MANUAL

PREPARING THE DOOR/LOCKS

Advertising