Installation procedure – Muxlab VGA 1x4 Hub User Manual

Page 9

Advertising
background image

© MuxLab Inc. VGA 1x4 Distribution Hub Installation Guide

Page 9

3.4.

Installation Procedure

In order to install the VGA 1x4 Hub, please follow the
steps below:

1. Install the VGA 1x4 Hub in its final location.

2. Connect the Active VGA Balun II Transmitter to the

VGA source. If there is a local monitor, connect it
to the Local Monitor Output of the Active VGA
Balun II Transmitter via a VGA cable (not
included).

3. If not using the Remote Power feature, connect a

power supply that comes with the Active VGA
Balun II Kit to the Active VGA Balun II
Transmitter. The green power LED should be ON.

4. Connect a length of Category 5E/6 (or better) UTP

cable between the Active VGA Balun II Transmitter
and the VGA 1x4 Hub. Note: DDC is on port # 1.

5. Connect an Active VGA Balun Receiver to each

display.

6. If the distance is within MuxLab specification for

remote power, then no power supply is needed at the
Receiver.

7. If the distance exceeds the MuxLab specification for

remote power, connect a Power Supply (500144) to
the Active VGA Balun II Receiver. The green
power LED should be ON.

Advertising