Prepare the installation, Remove the filters and the grease drip rail, Remove the pan – Broan BEST WPD29M User Manual

Page 5

Advertising
background image

Remove the installation kit from inside the hood.

Make sure that the following items are included:

- Wood strip (screwed on back of hood)

- Installation manual

- Transition (9’’ x 18’’ to 10’’ round)

- Accessories including:

• Baffle filters (3)
• Shielded halogen lights (GU10 type base, 120 V, 50 W) (4 for a 42” width hood, 6 for a 54” width hood)
• Bag of parts including:

(3) waterproof wire connectors, (2) wire clamps, (4) flat head screws #10-2’’, (8) screws #8 x 5/8’’, (8) screws #8 x 3/8’’,
(2) wall anchors, (2) washers 3/16’’ ID x 3/4’’ OD

Parts sold separately:
- Interior blower Model P12D.
- In-line blower assembly ILB11, including transitions and rough-in plate. Discard the rough-in plate.
- Exterior blower assembly EB12 or EB15 (all include rough-in plate). Discard the rough-in plate.
- Duct, elbows, dampers, wall and roof caps. Refer to page 3 for a complete list of venting options and model numbers.
- Optional decorative flue AEWPD Series.

- 5 -

2. PREPARE THE INSTALLATION

CAUTION

When performing installation, servicing or cleaning the unit, it is recommended to wear safety glasses and
gloves.

3. REMOVE THE FILTERS AND THE GREASE DRIP RAIL

A. Remove tape on filters.

Remove filters from hood and set aside.
NOTE: It is recommended to start with the
central one.

B. Remove tape on grease drip rail (1).

Lift out grease drip rail and set aside.

NOTE:

When tape is removed in the position as
shown at side, drip rail will possibly fall
out due to gravity.

HD0182

1

4. REMOVE THE PAN

Using a Phillips no. 2 screwdriver, remove the screws retaining the pan (shaded
part on illustration beside) to the hood. Remove the pan and set aside.

HD0183

R

ETAINING SCREWS LOCATION

Advertising