Alcove installation and clearances, Chimney – New Buck Corporation FS 21 User Manual

Page 19

Advertising
background image

Page 17

ALCOVE INSTALLATION

AND CLEARANCES

Select an installation location that will give the best airflow from the front of the heater to

the remainder of the home.



PREPARING THE STOVE FOR INSTALLATION


1. Inspect the unit for any obvious physical damage.
2. Plug the power cord into a 115V AC outlet to test the motor and fan when optional motor is

being used. “Do not run power cord under unit or in high traffic areas”.

3. Check the primary air draft control to ensure that it slides freely.
4. Remove any items from within the firebox.

Chimney

This model is designed for connection to any listed 2100º UL103 HT chimneys and parts.

This room heater must be converted to (1) a chimney complying with the requirements for
Type HT chimneys in the Standard for chimneys, Factory-Built, Residential, Type and
Building Heating Appliance, UL 103, or (2) a code approved masonry chimney with a flue
liner.

SECTION III

Advertising