Removing and installing throttle rail – BMW K 1100 LT/RS User Manual

Page 130

Advertising
background image

13.12

Removing and installing throttle rail

Remove fuel tank.

Remove left fairing side section.

Remove left-hand heat-insulating bulkhead.

Release fuel hose (1) at injection rail.

Release injection rail (2) at cylinder head and pull
out together with injectors.

Disconnect multiplug at throttle sensor.

L

Note:

Only remove throttle sensor if it is to be replaced
(basic setting necessary).

Detach throttle cable (3).

Detach operating cable (4) for start speed in-
crease.

Release hose clips at the air intake lines, loosen
at the throttle coupling.

Remove throttle rail from stub pipe.

Pull air return pipe (5) off throttle rail.

Disconnect indicator lamp plug connection for
start speed increase.

Install in the reverse order of removal.

L

Note:

Do not change the location of the hose clips on the
throttle coupling unions.
Firmly tighten hose clips at the air intake lines with
special tool, BMW No. 31 1 500.

LT130100

1

3

4

2

LT130110

5

Advertising