5kw generator, Operation – Steele Products SP-GG350 User Manual

Page 23

Advertising
background image

Operation

Powering 120 /240Volt AC Tools And Equipment:

1 Prior to powering tools and equipment, make sure the generator’s rated

voltage, and amperage capacity

(two120V-25AMPs outlets/one 240V-12.5AMPs

outlet)

is adequate to supply all electrical loads that the unit will power. If

powering exceeds the generator’s capacity, it may be necessary to group one

or more of the tools and/or equipment for connection to a separate generator.

CAUTION: ATTEMPTING TO POWER SENSITIVE

ELECTRONIC EQUIPMENT WITHOUT THE USE OF AN
APPROVED LINE CONDITIONER MAY CAUSE DAMAGE TO
THE EQUIPMENT. ALL-POWER IS NOT RESPONSIBLE FOR
ANY DIRECT OR INDIRECT DAMAGE CAUSED BY FAILURE TO
USE AN APPROVED LINE CONDITIONER.

4. When finished using the generator, turn the engine power switch to its
“OFF” position. Turn the fuel valve to its “OFF” position.
5. Disconnect all electrical powered tools and equipment from the
generator’s 120/240 volt AC duel outlets.
6. After the engine and generator have completely cooled, store generator
in a safe, clean, dry location (if not already installed).

2. Start the machine

.

3. Once the generator is running, simply connect the power cords of 120/
240 volt AC powered tools and equipment into the 120/240 volt AC dual
outlets.

Note: The Generator features an circuit breaker with the function of
overload protector to protect the AC circuit in case of an overload or
short circuit.

22

3.5KW Generator

Advertising