1. Install the eave trim by sliding it underneath the underlayment and securing it to the roof surface with

wafer head screws on 5’ centers.

2. There are no screws or nails to be placed in the exposed fascia of the trim.

3. At the corners, cut the eave trim 1 1/2” long and prepare the ends with tabs to receive the gable trim.

NOTE: Alternate trim profiles are acceptable using the screw pattern shown.

OPTION: The overhang illustrated below may be increased to extend up to 4” past the eave trim.