Standard adjustable gable & strip installation – Mueller CF Panel User Manual

Page 17

Advertising
background image

1. Starting at the corner, install the adjustable gable trim along the sloping gable,

placing it on top of the underlayment.

2. Attach with wafer head screws 5’ on centers (adjustable strip applied after valley trim).

3. Slide gable trim over eave trim at corner.

4. At the peak, one gable trim should be cut vertical to the ground

and overlap at the junction of the two gable trims.

NOTE: Alternate trim profiles are acceptable using the screw pattern shown.

17

STANDARD ADJUSTABLE GABLE & STRIP INSTALLATION

Details are subject to change without prior notice.

1. If valley trim is intersecting the gable, the valley must be installed first.

2. Pre-drill 1/8” holes on 12” centers along the length of adjustable gable strip #1476.

3. Butyl tape should be applied to the bottom of the strip covering pre-drilled holes. Place the strip

the desired distance from the outside edge of the gable trim (optimal distance 2”), making sure it
is aligned parallel to the gable, perpendicular to the eave line and between the open hem at the
edge of the adjustable gable trim and the outside of the trim.

4. The adjustable strip is attached to the roof with wafer head screws on 12” centers from eave to

ridge using pre-drilled holes, making sure the screws are applied through the butyl tape. This
condition exists in both Starting Panel and End Panel Installation.

NOTE: Alternate trim profiles are acceptable using the screw pattern shown.

Advertising