Floating high side eave, Installation steps: (use only with fixed eave) – Mueller Snap Lock (MSL) User Manual

Page 26

Advertising
background image

26

FLOATING HIGH SIDE EAVE

Installation Steps: (use only with fixed eave)

1. Using temporary clamps, attach backup channel to panel 2” below the eave strut. This step should

occur as panels are applied. Locate backup channel to accommodate attachment of rake trim.

2. Apply butyl tape sealant to the panel, centered on the backup channel.

3. Apply end dam and attach using #12 x 1 ¼ self drill screws on 4” centers.

4. Seal the end dam sides with tube sealant.

5. Apply butyl tape sealant to the top of the end dam.

6. Attach High side eave trim to the end dam using #14 x 7/8 lap screws on 6” centers as shown.

Mueller Snap

Lock Panel

Tape Sealant

Back Up Channel

End Dam

#12 x 1 1/4" Self Drill

Tek Screw with Washer

Tube Sealant on

Vertical Edges

Eave Strut

Rake Trim

#14 x 7/8" Lap

Optional Closure

Tek Screw

RPN Wall Sheet

Clip

#10 x 1" Pan Head

Self Drilling Screw

Tape

Sealant

#14 x 7/8" Lap

Tek Screw

2" Minimum

Clearance

Advertising