Side wall / parapet details | wood deck, Installation steps – Mueller Snap Lock (MSL) User Manual

Page 39

Advertising
background image

39

14ga Slotted

Rake Angle

Rake Trim

Support Angle

Counter Flashing by Others

#14 x 7/8" Lap Tek Screw

Side Wall Trim

#12 x 1 1/4" SD Tek Hex with Washer

Tri-Bead

Sealant

#14 x 1 1/4

" SD

Shoulder Screw

Wood Deck

Underlayment

Installation steps:

1. To begin starting panel first attach the Slotted Rake Angle to the existing wood deck using #14 x 1¼”

SD Shoulder tek screws as shown.

2. Place the female leg of the first panel over the upturned edge of the Slotted Rake Angle.

3. Install Rake Trim Support Angle as pictured using tri bead sealant and secure using #12 x 1¼” SD screws thru

the Rake Trim Support Angle, tri bead, panel leg and into the 14 ga. Slotted Rake Angle.

4. Apply tri bead to the top of the Rake Trim Support Angle and install side wall trim as shown with #14 x 7/8”

lap screws on 6” centers.

5. Attach the appropriate counter flashing as required by the application. This is supplied by others.

6. For last panel run, field cut the panel if necessary to form a 1 ¾” up turned leg that will position against the

slotted rake angle when installed. Then complete the trim using the above steps.

SIDE WALL / PARAPET DETAILS

|

WOOD DECK

Advertising