JB Conversions 2308 Dana 300 User Manual

Page 11

Advertising
background image

11

15) Be sure to push the bearing all the way onto the top of the bearing

during shim setup (Fig.16).

FIG: 16

16) End play must be checked for proper bearing preload. Push the bearing

number 30207 onto the shaft as shown (Fig.17). You will need to install the

yoke and "special setup nut" (torque to 180 ft-lbs) before checking

endplay. Use a dial indicator (not shown) to observe 0.000"-0.0015" of end

play. It is easier to perform the endplay adjustments at this time instead of

later in the installation after the remainder of the entire case is being

handled.

Advertising