Synergy 5221 - 07-10 Jeep JK 2/4 Door Front Cage Kit User Manual

Page 7

Advertising
background image

14. The images below are taken as a reference for cutting the underside of the body in

order to fit cage tie-ins. Trace a rectangle that  goes  6”  back  from  the  middle  of  the  
stock rocker threaded hole to the  middle  of  the  1”  x 2”  rectangle. Continue the
rectangle  1”  forward  from  the  threaded  hole  to  just  about  where  the  bottom  of  the  
body contours up. See image 14.1 and 14.2 below.

Image 14.1

Image 14.2

15. Next, cut off the inner edge closest to the frame rail. Be careful not to cut the floor or

frame when cutting.

Advertising