SECTION 2 - PROCEDURES
3120855
– JLG Sizzor –
2-21
.
4.
Remove end cover assembly (2) and seal ring (4).Discard seal ring
NOTE: Refer to the appropriate “alternate cover construc-
tion” on the exploded view to determine the endcover construction being serviced.