Bunn H5X User Manual

Page 12

Advertising
background image

12

SERVICE (cont.)
Electronic Controls (cont.)

7. Reconnect the pink wire to terminal 5 of the elec-

tronic control assembly.

8. Loosen the compression fitting, remove the probe

from the tank lid, and inspect it for mineral depos-
its. Replace it if necessary. Keep the exposed ends
of the probe away from any metal surface of the
dispenser.

9. Check the voltage across terminals 1 & 4 of the

electronic control assembly with a voltmeter. Con-
nect the dispenser to the power source. The indi-
cation must be:
a.) 100 to 120 volts ac for 100 to 120 volt models
or
b.) 200 to 240 volts ac for 200 to 240 volt models
or
c.) 230 volts ac for 230 volt models after a delay of
approximately 5 seconds.

10. Touch the screw head end of the probe to the dis-

penser housing. The indication must be 0.

11. Move the probe away from the dispenser housing.

The indication must again be:
a.) 100 to 120 volts ac for 100 to 120 volt models
or
b.) 200 to 240 volts ac for 200 to 240 volt models
or
c.) 230 volts ac for 230 volt models
after a delay of approximately 5 seconds.

12. Disconnect the dispenser from the power source.

Temperature Control Flow Charts (cont.)

Still Boiling

?

Red Light On While

Boiling

?

Retry

Drain cup

Retry

Disconnect Blue Wire From

Control Board Pin 7

No

Yes

Yes

Yes

No

No

H5X THERMOSTAT

PROBLEM: Boils Excessively - Fills Cup

Still Boiling

?

Replace Steam Sensor

Replace Triac Assembly

Check For Split

Tank Heater

Replace Control Assembly

Finished

Replace Control Assembly

Still Boiling

?

Red Light On While

Boiling

?

Retry

Drain cup

Retry

Disconnect Blue Wire From

Control Board Pin 7

No

Yes

Yes

No

H5E THERMOSTAT

PROBLEM: Boils

Replace Triac Assembly

Check For Split

Tank Heater

Replace Control Assembly

Replace Control Assembly

If voltage was present as described, reinstall the probe,
the sensing function of the system is operating prop-
erly.
If voltage was not present as described, check the pink
probe wire and the green ground wire for continuity
and/or replace the probe.

Temperature Control Test Procedure

1. Disconnect the dispenser from the power source.
2. Check the voltage across terminals 3 & 4 of the

electronic control circuit board with a voltmeter.
Connect the dispenser to the power source.The in-
dication must be:
a.) 100 to 120 volts ac for 100 to 120 volt models
or
b.) 200 to 240 volts ac for 200 to 240 volt models
or
c.) 230 volts ac for 230 volt models.

3. Disconnect the dispenser from the power source.

If voltage was present as described, proceed to #4.
If voltage was not present as described, refer to the
Wiring Diagram and check the dispenser wiring har-
ness.

4. Connect the dispenser to the power source and

place the tank heater switch in the “ON” position.

5. Observe the red indicator on the electronic control

circuit board.

6. Disconnect the dispenser from the power source.

10420 091902

Advertising