Industrial PCs OPC5115

14

© ads-tec GmbH • Raiffeisenstr.14 • 70771 Leinfelden-Echterdingen

5.2

C

ABLE INSTALLATION

The device interfaces and power supply plug are found on the side of the casing. The free

slots and the drives are found in the same place.

5.3

S

TARTUP PROCEDURE

For 230 V AC device: Insert the power cable in
the IEC connector and connect it to the power

source.

For 24 V DC device:

Place the cable end

sleeves of the power cable wires in the terminals.

Connect the cable for serial / parallel data transfer and fasten the plugs to the sockets.

Connect all further required cables and secure against slippage.

5.4

O

PERATIONAL READINESS CHECK

Connect the power cable to the power source.

Check the device to determine whether hidden damages have been caused by
improper transport, incorrect operation or storage conditions or improper handling
(e.g. smoke emission from the device, etc.). If damages are found, immediately

shut down the device and protect it against unintentional startup.