9. CLEAN-UP & HAND-OFF

A. Conduct a final inspection of the lift installation using the Installation Checklist in the

Appendix of this manual. Correct any deficiencies before clean-up & hand-off.


B. Apply proper signage to all locations of the installation per the guidelines in the Label

Identification section and per any instructions shipped separately with the gate
interlock kits. Contact Autoquip at 888-811-9876 if labels appear to be missing or
damaged.


C. Train key personnel on the operation of the system and all safety features and

procedures by referencing the corresponding sections in this manual.


INSTALLER GUIDELINES/RESPONSIBILITIES