Installation, Instructions – Autoquip FREIGHTLIFT FLM User Manual

Page 73

Advertising
background image

73



2. Turn the power off and adjust the ECS amp rating up by turning the small amp

dial on the front of the ECS in a clockwise direction. Do not increase more than 5
amps at a time. Repeat this process until the lift will raise the rated load without
shutting off.


3. Once the lift will operate with the nameplate capacity on the lift carriage, add an

additional 15% to the amp draw reading on the dial. Run the lift several times to
make sure your setting is correct and the carriage will run full up and down
without tripping ECS off. If the ECS does still trip off go back to step one and
repeat setting requirements.

WARNING

!

To avoid serious injury or death, GUARDS, INTERLOCKS, and SAFETY
DEVICES must be restored to correct operation when installing parts or
making repairs.



Figure 35 ECS Enclosure








INSTALLATION

INSTRUCTIONS

Amp Dial

Advertising