It2000-ab, Operating instructions, 15 of 38 – BAND-IT IT2000-AB 1/4 Junior Tool User Manual

Page 15: 1/4” junior, Tool

Advertising
background image

Document # I17792 Rev G

© Copyright

BAND-IT-IDEX, Inc. 2009

All rights reserved

www.BAND-IT-IDEX.com

BAND-IT-IDEX, Inc.

A Unit of IDEX Corporation

4799 Dahlia Street Denver, CO 80216-0307 USA

P: 1-800-525-0758 F: 1-800-624-3925

15 of 38

IT2000-AB

1/4” Junior

®

Tool

2.5”

1. Insert clamp tail into tool as shown. Clamp tail length
extending into tool must be at least 2.5” (6.4 cm) long. The
head of the tool should rest against the buckle. Note - Do not
activate tool while inserting clamp tail. This can cause
clamp tail to jam in the Tension Block Assembly.

2. Begin tensioning clamp by pushing and holding down
operating trigger

3. Band should be applied to a uniform solid surface allowing
the buckle adequate support during the clamp locking and
clamp tail cut-off operation.

4. While tensioning clamp, hold tool slightly tipped forward.
This will assist proper clamp installation. Continue to hold
down operating trigger until tool completely tensions and
cuts off clamp. Release trigger after cut-off.

5. After clamp is completed, clamp tail scrap must be
removed from tool. Clamp tail scrap is not ejected
automatically. Tool is now ready for next clamp.

Operating
Instructions

Advertising