BKI FW-15L User Manual

Page 14

Advertising
background image

Sandwich/Fry Warmer

Installation

12

8. Using a 1/8” drill bit, drill holes in countertop through existing holes in the main unit and collar weldment

flanges.

9. Secure main unit and collar weldment to countertop using #8 sheet metal screws.

10. Feed power cord (supplied), down through hole in countertop.

11. Reattach louvered blower box to main unit.

12. Seal main unit to the countertop to conform to NSF Standard 4, Item 4.28. (Dow Corning RTV #732 Multi

purpose Sealant.)

13. Place the blower pan into the hole making sure that open side of the pan fits over the two tabs on the

louvered blower box.

14. Place the perforated pan insert into the blower pan.

Advertising
This manual is related to the following products:

SFW