5.1

95-8630

5

rESPoNSE ProoF TEST
Tools Required: Compressed Calibration Gas Kit

provided by Det-Tronics

This proof test, commonly referred to as a “gas

bump test”, requires application of high accuracy

compressed calibration gas to the detector while in

NORMAL operational mode and inspecting the signal

output level to ensure that the signal output is accurately

indicative of the applied test gas concentration.

WARNING

Any external alarm equipment, systems or
signaling devices that could be automatically
initiated by performing this test must be disabled
or bypassed before performing this test!

NOTE

If proof testing a PIRECL model without the
optional relay outputs, disregard those parts of
the proof test sequence.

response Proof Test Sequence
1. Inhibit alarm and fault response at the control

device.

2. Apply test gas to the PIRECL. The test gas

concentration should be sufficient to trip both the

Low and High alarm relay outputs.

3. Verify correct change of state at the control device

for both the alarm relay outputs and the 4-20 mA

output. Criteria for the 4-20 mA inspection pass of

a gas detector is a response signal within ±3% of

applied gas concentration (generally, a 50% LFL

test concentration is applied).

4. Remove the test gas and ensure that the unit returns

to normal operation.

5. Relay output only: induce a fault to the PIRECL.

Suggested fault induction methods are listed below:

– Remove the weather baffle, then block the beam.

– Remove input power to the PIRECL.

6. Relay output only: verify correct change of state at

the control device for the fault relay output.

7. Relay output only: correct the fault condition and

ensure that the unit returns to normal operation.

8. Re-activate the alarm and fault response at the

control device.

If the response test is not within acceptable limits, a

Full Calibration procedure must be performed and

Response Proof Test re-performed.

Full Calibration

Tools Required: Compressed Calibration Gas Kit

provided by Det-Tronics

Magnet or HART Field Communicator

Full Calibration shall be conducted when required as

documented in the Calibration section of the PIRECL

instruction manual. It is permissible to conduct the

Full Calibration using either the onboard magnetic

calibration switch or using an approved HART

handheld field communicator. In all cases the PIRECL

should be allowed to warm up for one hour minimum

before conducting calibration.

NOTE

The last seven (7) Full Calibration procedures are
logged with a time stamp (operating hour units) in
the PIRECL onboard memory.

Successful completion of the Response Proof Test

must be recorded and documented in the SIS logbook.

WARNING

Any external alarm equipment, systems or
signaling devices that were disabled must be
re-activated at the conclusion of proof testing
activities.

NOTE

The use of the Full Calibration test shall be limited
to maintenance and proof test activities.

FAULT/FAiLUrE ACTioN PLAN
In the event that a Full Calibration does not result in

acceptable Response Proof test, then the standard

Maintenance, Troubleshooting, and Device Repair and

Return procedures as listed in the PIRECL instruction

manual must be followed. Any failure to successfully

complete the Response Proof Test must be recorded

and documented in the SIS logbook.