Elkhart Brass UBEC 1AT AUTO TANK Fill System User Manual
Page 7
Advertising
7
INSTALLATION INSTRUCTIONS
TankVision Display Module
Note: It is recommended to mount the display at eye level for accurate tank level readings.
1. Measure and mark mounting location for display module panel cutout and mounting screw holes.
Make sure there is a clearance behind the panel for the display and cables before cutting holes.
Refer to Figure 2 below.
2. Cut out a 4” by 2 1/8” hole and drill four (4) holes (clearance or tapped) for 6-32 mounting
screws.
3. Place Display Module in position and secure with four (4) screws.
4. Connect the Display Module cables and wires. (Please refer to Wiring Section on page 17)
Figure 2: Display Module Dimensions
Advertising