Elkhart Brass UBEC 1AT AUTO TANK Fill System User Manual

Page 7

Advertising
background image

7

INSTALLATION INSTRUCTIONS
TankVision Display Module

Note: It is recommended to mount the display at eye level for accurate tank level readings.

1. Measure and mark mounting location for display module panel cutout and mounting screw holes.

Make sure there is a clearance behind the panel for the display and cables before cutting holes.

Refer to Figure 2 below.

2. Cut out a 4” by 2 1/8” hole and drill four (4) holes (clearance or tapped) for 6-32 mounting

screws.

3. Place Display Module in position and secure with four (4) screws.
4. Connect the Display Module cables and wires. (Please refer to Wiring Section on page 17)

Figure 2: Display Module Dimensions

Advertising