Installation, Zero set feat – Kisan Electronics CX-10 User Manual

Page 11

Advertising
background image

Page -

9

INSTALLATION


Shunt installed on the NEGAT
(Ground) post of the battery.

„

COPPER EYLET towards the

battery post

Power wire must be attached to

URE

IVE

„

the Positive post of the battery.





ZERO SET FEAT

DO NOT BEND the Current Sensor. Keep it
ground cable as shown.

as been calibrated for zero-

offset values are stored in

the Display.

null point:

n

Turn everything Off – no load on the battery

o

Push the Mode button momentarily to show AMP screen

p

If the AMP reading is

q

Let the Display scroll

.

The Display backlight will

r

AMP icon will begin flashing – now release the Mode button


T

y

The Integrated Shunt h
set at the factory. The
permanent memory of

If you need to reset

not zero, Push & Hold the button

through twice & return to AMP mode

go dark.

free by rotating it away from the

he reading will be set to zero and the new offset values for the null point

ou have chosen will overwrite the factory setting.

Advertising