Plumbing requirements-current twins – Bunn CWTF User Manual

Page 7

Advertising
background image

Page 7

1. Remove six screws securing rear utility cover (if

equipped). FIG 7-1

2. Remove cap from the flared fitting on the bottom

of the center tube assembly.

3. Flush the water line and securely attach it to the

flare fitting on the center tube assembly. FIG

7-2

4. Turn on the water supply.

5. Re-install rear utility cover. FIG 7-3

6. On models with faucet, place an empty vessel

beneath the faucet and lift the handle until water

is dispensed.

FIG 7-1

TWINS

These brewers must be connected to a cold water system with operating pressure between 20 and 90 psi

(138 and 620 kPa) from a

1

2

" or larger supply line. A shut-off valve should be installed in the line before the

brewer. Install a regulator in the line when pressure is greater than 90 psi (620 kPa) to reduce it to 50 psi (345

kPa) . The water inlet fitting is

3

8

" flare.

PLUMBING REQUIREMENTS-CURRENT TWINS

FIG 7-2

FIG 7-3

41721 111308

Advertising
This manual is related to the following products:

CT