Powertrax 4120 User Manual

Page 18

Advertising
background image

18

(and thrust block, if used) are in place and that the springs are

working properly.

When the above installation steps are completed, all

the parts should be in exactly the same positions as they were

when the installation began. The backlash and pre-load settings

should be unchanged from before and no further adjustments

will be needed. To be certain, rock the ring gear back and forth to

see if the backlash appears to be the same as it was prior to the

installation. If not, it will need to be reset with a dial indicator as

described in the shop manual. Rotate the ring gear one revolu-

tion to be sure that nothing is binding.

Third Member Installation

1. Clean the mating surface of the axle housing and the

mounting surface of the differential carrier.

2. Clean the inside of the axle housing to remove all

foreign material. This step is very important because metal

chips can interfere with the operation of your new LOCK-RIGHT.

3. Remove metal chips from the drain plug if it is mag-

netic.

4. Install a gasket and/or sealant as appropriate.

5. Lift the third member into the axle housing and

shove it into the studs.

6. Install and torque the hardware.

7. Re-install the axle shafts and finish the remaining

vehicle re-assembly steps.

Vehicle Final Assembly

Add gear oil. Note that we suggest using medi-

um-to-heavy oils as recommended by the manufacturer, unless

the vehicle will be used in very cold weather. Thicker oil, such

as 85-140, reduces the “clicking” noise sometimes heard during

tight turns and provides adequate lubrication when the assembly

becomes hot. Also see the section in the Vehicle Operators Man-

ual regarding temperature.

Advertising
This manual is related to the following products: