Coin operation, Installation instructions – Summit TDC111V User Manual User Manual

Page 26

Advertising
background image

4

6

7

8

5. Remove ground wire (green with yellow

stripes) from external ground connector screw
and remove from center terminal block.

6. Connect ground (green) wire of cord to external

ground conductor screw.

7. Connect neutral (white) wire of cord under

center screw of terminal block.

8. Connect the other wires to outer screws.
9. Tighten the strain relief screws.
10. Replace terminal box cover on back of dryer.
11. Plug dryer into wall receptacle.
12. Turn power on at breaker/fuse box.

Coin operation

The machine is prepared for coin operation. Such
installation must be carried out by a qualified
professional.

The installation requires a connection cable to
power the coin meter. This connection cable can
be ordered using spare part number 92 090 95.

The coin meter shall be able to short circuit two
signal lines for periods of up to 10 minutes. This
is to give the user time to load the machine,
choose a program, and start the program after
putting the coins in.

"Insert coin" appears on the display when the
machine is started with the main power switch.

Customer Care Center

1-800-898-1879

26

www.askousa.com

Installation instructions

Advertising
This manual is related to the following products: