Section 4

Installation, Initial Start-Up and Operation


4.1 Piping Installation

The following procedures are to aid the operator in installing, operating and maintaining
the Thrush Pressurizer-VS. All procedures are to be performed by experienced, trained,
and certified personnel only.

Before the unit is installed, the unit should be visually inspected for any irregularities that
may have occurred during shipping. If any parts are missing or damaged, contact your
representative. If no issues are detected, continue with installation.

Before making any piping connections, assure that all piping is clean and free of

any foreign materials such as debris or scale. Foreign material in the piping can

cause damage to the unit and or affect the performance and operation. Manual

shutoff valves should be installed upstream and downstream of the system to act

as an isolation device. These valves should be in the closed position and remain

so until the installation is complete.

ISOLATION VALVE(S)

(OPTIONAL)

6" PUMP

MAINTENANCE

CLEARANCE

SUCTION SPOOL

W/MOUNTING FEET

(OPTIONAL)

PIPE SUPPORTS

PIPE SUPPORTS

MOUNTING FEET

(OPTIONAL)

Figure 4-1 Pipe Supports

1. The Pressurizer-VS should be located in a clean open area, where it is easily

accessible for inspection, service and repair.

2. A standard Pressurizer-VS is installed in-line of the system piping. Optional

mounting feet can be used for floor mounted or wall mounted installations. See
paragraph 3.2.1. and Figure 4-1

3. Note that a minimum 6” of clearance above the drive mounting bracket is

recommended to allow for maintenance and repair of the motor and pump.

Thrush Co.

Manual #9636-1400

6