Thrush co – Thrush DSHE Series User Manual

Page 17

Advertising
background image

Thrush Co.

Manual #9636-0555

4.2 Installation (Continued)

TEMP SENSOR

 PROBE

Y‐STRAINER

STEAM INLET

CONTROL PILOT

STEAM CONTROL

VALVE)

STEAM TRAP

(PIPED TO ADEQUATE DRAIN)

Y‐STRAINER

GATE VALVE

DIRT LEG

COLD WATER

INLET

HOT WATER

OUTLET

SAFETY RELIEF VALVE

(PIPED TO ADEQUATE DRAIN)

REDUCER SPOOL

(IF REQUIRED)

Figure 4-3 Piping Installation

1. Connect the cold water source to the water side connection port. Be sure the

upstream manual shutoff valve is in the closed position. If an in-line check valve
or back flow preventer is used, a suitable expansion tank must be installed in the
hot water outlet side of the unit. (Figure 4-3)

2. Connect the hot water outlet piping to the hot water outlet port. Be sure the

downstream manual shutoff valve is in the closed position. (Figure 4-3)

3. Connect the steam piping to the steam inlet port (Figure 4-3).

Any temperature control valve installed on the Hot-Pak should be of the

fail-closed design.


The temperature control valve should be installed per the valve manufacturer’s
instructions. A 1 ¼” NPT connection for the temperature sensing element is
located beneath the relief valve connection.


Advertising
This manual is related to the following products: