Thrush DSHE Series User Manual

Page 6

Advertising
background image


Thrush Co.

Manual #9636-0555

2.1 Safety Information continued

Before making any piping connections, assure that all piping is clean and free of

any foreign material such as debris or scale. Foreign material in the piping can

cause damage to the unit and/or affect the performance and operation. Manual

shutoff valves should be installed upstream/downstream from all connections to

act as an isolation device. These valves should be in the closed position and

remain so until the installation is complete.

Any temperature control valve installed on the Hot-Pak should be of the fail-closed

design.

When starting up, always introduce the cold fluid first. Introduce the hot side fluid

slowly. Bring the unit from ambient temperature up to operating temperature

gradually. Do not introduce hot or cold fluids suddenly, which could damage the

unit and void the warranty. A qualified electrician should make all electrical

connections.

To protect the tube bundle from damage, the unit must be filled with water before

allowing steam to enter.

When shutting down, always shut off the hot fluid first.

The support stand was designed to aid the installation process of the Hot-

Pak into system piping. The support stand is not a replacement for system

piping supports. System piping must be supported before and after the Hot-

Pak in conjunction with the support stand.

Advertising
This manual is related to the following products: