Application guide – USG Ceiling True Wood User Manual

Page 28

Advertising
background image

27

Specifications

aPPliCaTion

GUide

1.01

related documents

A. Drawings and general provisions of the Contract, including General and

Supplementary Conditions and Division 1 Specification Sections, apply to this Section.

1.02

references

A. ASTM C635, Standard Specifications for Metal Suspension Systems
B. ASTM C636, Recommended Practice for Installation of Metal Suspension System
C. ATSM E84, Standard Test Method for Surface Burning Characteristics of

Building Materials

D. CISCA Ceiling Systems Installation Handbook.
E. CISCA Wood Ceilings Technical Guidelines

1.03

Summary

A. Section Includes:
1. Acoustical ceilings panels
2. Exposed grid suspension system.
3. Wire hangers, fasteners, main runners, cross tees, and wall angle moldings.
B. Related Sections include the following:
1. Section 01 41 13 (01450) - Codes
2. Section 01 45 33 (01450) - Code-required Special Inspections and Procedures
3. Section 09 20 00 (09250) - Plaster and Gypsum Board
4. Divisions 23 (15) - HVAC
5. Division 26 (16) Sections - Electrical Work

1.04

Submittals

A. Samples: Submit panel finish and suspension system main and cross tees

for acceptance

B. Shop drawings:
1. Reflected ceiling plans: Submit ceiling suspension system layout indicating

dimensions, lighting fixture locations, and related mechanical components.

2. Assembly drawings: Indicate installation details, accessory attachments and

installation of related lighting fixtures and related mechanical system components.

3. Samples: Minimum 4 inch x 6 inch samples of specified acoustical panel; 8 inch long

samples of exposed wall molding and suspension system,including main runner and

4 foot cross tees.

C. Manufacturer's data:
1. System details: Submit manufacturer's catalog cuts, literature, or standard

drawings showing details of system with project conditions clearly identified and

manufacturer's recommended installation instructions.

D. Maintenance materials: Provide _______ % of amount of main tees, cross tees,

and panels.

1.05

delivery, Storage, and Handling

A. Delivery of materials: Deliver materials in original unopened packages, clearly

labeled with manufacturer's name, item description, specification number, type,

and class as applicable.