Application guide – USG Ceiling True Wood User Manual

Page 29

Advertising
background image

28

Specifications

aPPliCaTion

GUide

1.05

delivery, Storage, and Handling

cont.

B. Inspection: Promptly inspect delivered materials, file freight claims for damage during

shipment, and order replacement materials as required. Any damaged materials shall

be promptly removed from the job site.

C. Storage: Store in manner that will prevent warpage, water damage, or damage

of any kind. Prevent interference to/by other trades and any other adverse job

conditions due to storage locations or methods.

D. Handling: Handle in such a manner as to ensure against racking, distortion, or physical

damage of any kind.

1.06

Quality assurance

A. Subcontractor qualifications: Installer shall have not less than three years of

successful experience in the installation of ceiling suspension systems on projects

with requirements similar to requirements specified.

B. Requirements of regulatory agencies: Codes and regulations of authorities

having jurisdiction.

C. Delete paragraph below if not required. If retaining, indicate location, size, and

other details of mockups on Drawings or by inserts. Revise wording if only one

mockup is required.

D. Source quality control: Manufacturer will provide test certification for ceiling system

as required to meet industry performance standards specified by various agencies.

E. Delete below if work of this Section is not extensive or complex enough to justify

a preinstallation conference. If retaining, coordinate with Division 1 Section

"Project Meetings."

F. Pre-installation Conference: Conduct conference at Project site to comply with

requirements in Division 1 Section "Project Meetings."

1.07

Project Conditions

A. Building conditions: Building shall be enclosed with all windows and exterior doors in

place and glazed, and the roof watertight before installation of suspension system.

B. Interior temperature/humidity in building: Climatic conditions in areas to receive

ceiling suspension systems shall range from 60°F (16°C) to 85°F (29°C) and relative

humidity of not more than 55% shall be maintained before installation of components.

1.08

extra Materials

A. Furnish extra materials described below that match products installed and that are

packaged with protective covering for storage and identified with labels describing

contents.

a. Ceiling Panels: Furnish quantity of full-size units equal to _______ % of amount

installed.

2.01

Products and Manufacturers

A. True Wood ceiling panels:
a. PART 1 - True Wood ceiling panels will be made with a [veneer species] face

veneer, [veneer cut] [veneer match], applied to a 3/4" thick core material. The edge

treatment on the True Wood panels shall be the [selected style]. The standard

True Wood ceiling panel shall be 3/4" thick and [selected size] (nominal). Wood

is a natural product that will undergo changes with variations in the environment.

Therefore, all dimension tolerances shall be ± 1/8".

Advertising