Identification of parts, Operation system – Yamato Scientific WG221S Water Purifiers User Manual

Page 21

Advertising
background image

-19-

Identification of Parts

Operation System

This drawing identifies WG221S operation system by the process.
(There are some different parts used for WG221.)

(1) Drain boiler water

●Turn the circuit breaker on and push the power switch ,then after 15sec.

solenoid valve to drain

boiler water opens for about 40sec. and at the same time

solenoid valve for cooling water opens

for about 30sec.

(2)Supply and distillation of boiler water

After finished boiler water drainage,

 solenoid valve for raw water and

 solenoid valve for boiler

water opens at the same time ,and then water is supplied into boiler.

When

float switch (to control the boiler water level) in the

float receptacle finds water level

sufficient,

heater becomes on to start distillation.

Following water supply, when

float switch controls water supply into the boiler by opening and

closing

solenoid valve for raw water and

solenoid valve for boiler water.

Advertising
This manual is related to the following products: