Hardware installation, Starter assembly instructions – Rockwell Automation 193/592-EC1/EC3/EC5 E3 and E3 Plus Solid-State Overload Relay - Quick Reference User Manual
Page 5
Advertising
5
Publication 193-QR003B-EN-P - October 2009
Hardware Installation
The following figures illustrate the starter assembly instructions.
Starter Assembly Instructions
Figure 1: 100-C09…C43 Starter Assembly Instructions (for use with Cat. Nos.
193-EC_ _B and -EC_ _D)
1
2
CLICK
3
/tN
22 lb-in.
Advertising