Hardware installation, Starter assembly instructions – Rockwell Automation 193/592-EC1/EC3/EC5 E3 and E3 Plus Solid-State Overload Relay - Quick Reference User Manual

Page 5

Advertising
background image

5

Publication 193-QR003B-EN-P - October 2009

Hardware Installation

The following figures illustrate the starter assembly instructions.

Starter Assembly Instructions

Figure 1: 100-C09…C43 Starter Assembly Instructions (for use with Cat. Nos.

193-EC_ _B and -EC_ _D)

1

2

CLICK

3

/tN

22 lb-in.

Advertising