Rockwell Automation 1609-S350ES Uninterruptible Power Supply - 350VA User Manual

Page 4

Advertising
background image

41063-285-01 (1)

990-2955 05/2006

Hardwiring

Wiring of the UPS should be performed by a qualified electrician using appropriate wire gauges.

Start-Up

Connecting Power and Equipment to the UPS

1. The UPS features a transient voltage surge-suppression (TVSS) screw

located on the front panel. The TVSS screw is used

for connecting the ground lead on surge suppression devices.
Prior to connecting the grounding cable, ensure that the UPS is NOT connected to input (utility), or battery power.

2. Connect the battery (see Connecting the Battery).
3. Hardwire the UPS.
4. Connect equipment to the UPS.
5. Turn on all connected equipment. To use the UPS as a master on/off switch, be sure all connected equipment is switched on.

6. Press the

button on the front panel to start the UPS.

The battery charges to 90% capacity durin the first four hours of normal operation.

Do not expect full battery run capability during this initial charge period.

7. For optimal computer system security, install PowerChute

®

monitoring software included with the UPS.

Communications/Serial Port

Use the cable supplied with the UPS. A standard standard interface cable is incompatible with the UPS.
This port enables remote configuration and monitoring with the use of PowerChute software.

Advertising
This manual is related to the following products: