7 - test module operation, Test the slc 500 system, Test the module – Rockwell Automation 1746-FIO4V SLC 500 Fast Analog I/O/ User Manual User Manual

Page 67: Chapter 7, Test module operation, Test the slc 500 system test the module, Chapter

Advertising
background image

67

Publication 1746-UM009B-EN-P - September 2007

Chapter

7

Test Module Operation

This chapter helps you test the operation of the module’s I/O
channels.

Test the SLC 500 System

Testing the SLC 500 system is beyond the scope of this manual. We
mention it here only because you should test and debug at the system
level before testing and debugging the module in the system.

If your module is installed in the expansion rack of a fixed system, test
your SLC 500 system using procedures described in the Fixed
Hardware Installation & Operation Manual, publication 1747-6.21,
before testing the analog module.

If your analog module is installed in a modular system, test your
SLC 500 system using procedures described in the SLC 500 Modular
Hardware Style User Manual, publication 1747-UM011, before testing
the analog module.

Test the Module

Once you have tested your SLC 500 system, follow this procedure to
test the module at start up. We describe each of the steps in detail.

1. Inspect module switches and wiring.

2. Disconnect analog process control devices.

3. Apply power to the I/O rack.

4. Test analog inputs.

5. Test analog outputs.

Advertising
This manual is related to the following products: