Installing Block I/O

In this chapter you will learn how to mount the block, connect the remote
I/O link, connect the input and output wiring to the block, and terminate
the remote I/O link.

Before installation, you must determine:

the number of blocks desired
the total distance of the installation
transmission rate desired
if external fuses are required

Refer to Table 3.A for acceptable combinations.

Table 3.A

Acceptable Combinations of Processor and Block I/O

When using

and

Maximum Capacity

Baud Rate

Used

Maximum

Network Distance

PLC-2 family

16 blocks with 150 ohm terminator

57.6K

10,000 cable-feet

Any scanner module

28 blocks with 82 ohm terminator

57.6K

10,000 cable-feet

28 blocks with 82 ohm terminator

115.2K

5,000 cable-feet

PLC-3 family

16 blocks with 150 ohm terminator

57.6K

10,000 cable-feet

1775ĆS4A, ĆS4B, ĆS5, ĆSR

32 blocks with 82 ohm terminator

57.6K

10,000 cable-feet

1775 S4A, S4B, S5, SR

or ĆSR5 module

32 blocks with 82 ohm terminator

115.2K

5,000 cable-feet

32 blocks with 82 ohm terminator

230.4K

2,500 cable-feet

PLC-5 family

16 blocks with 150 ohm terminator

57.6K

10,000 cable-feet

Note: PLCĆ5250 requires a

32 blocks with 82 ohm terminator

57.6K

10,000 cable-feet

Note: PLC 5250 requires a

5150ĆRS remote scanner

32 blocks with 82 ohm terminator

115.2K

5,000 cable-feet

32 blocks with 82 ohm terminator

230.4K

2,500 cable-feet

TABLE CONTINUED ON NEXT PAGE

Chapter Objectives

Pre-installation

Considerations

Advertising
This manual is related to the following products: