Panel/wall mounting – Rockwell Automation 1440-TBS-J XM Dynamic Measurement Module Terminal Base User Manual

Page 15

Advertising
background image

XM Dynamic Measurement Module Terminal Base 15

Publication

ICM-IN003D-EN-P - March 2013

Panel/Wall Mounting

Installation on a wall or panel consists of:

laying out the drilling points on the wall or panel.

drilling the pilot holes for the mounting screws.

installing the terminal base units and securing them to the wall or
panel.

Follow these steps to install the terminal base on a wall or panel.

1. Lay out the required points on the wall/panel as shown in the drilling

dimension drawing below.

Maintain at least 25.4 mm (1.0 in.) air space around your XM system
installation.

2. Drill the necessary holes for the #6 self-tapping mounting screws.

3. Secure the terminal base unit using two #6 self-tapping screws.

4. To install another terminal base unit, retract the side connector into

the base unit; make certain it is fully retracted.

40.10
[1.577]

35.51
[1.398]

23.50
[.925]

94.01
[3.701]

Screw hole for
panel/wall
mounting.

Grounding
screw hole
for panel/
wall
mounting.

Advertising