System start up procedure – B&D Mfg Smart User Manual

Page 11

Advertising
background image

11

ALL THE PUMP YOU NEED AND MORE

Revised 7-5-12

System Start Up Procedure

Fill canister water level to dip tube elbow.

**Valve and flange adapter not included and are available as an option only**

Pump isolation valves

Figure 2

Sensor assembly at any of
the locations on the pump.

Pressure Relief Valve

Must stay open during all purging processes.

WARNING:

During the purging process, the rate of flow is not equal. When air returns

to the canister you may see an overflow. You can control this by adjusting the flow back to
the canister by a valve. Pressure relief valve must remain open until all air is purged or the
canister may collapse. Do not completely seal the canister from outside air during this
process.

WARNING:

BE SURE THE MUTIZONE CANISTER DOES NOT RUN OUT OF WATER.

Advertising